Algorhythm Holdings, Inc. (RIME): Form 8-K filed 2026-11-13
- Accepted by EDGAR
- 2026-11-13 16:30 ET
- Event date
- 2026-11-09
- Accession no.
- 0001493152-26-051750
- Original filing
- SEC EDGAR filing index
AI summary of the filing text. It can contain mistakes; the original filing is authoritative.
Algorhythm Holdings discloses Ryan J. Smith's transition from COO to Delivery Project Executive
On November 9, 2026, Ryan J. Smith transitioned from Chief Operating Officer to Delivery Project Executive as part of an internal restructuring of Azure Energy. He is no longer an executive officer or officer, and the Company does not intend to appoint a successor Chief Operating Officer at this time. The transition was not the result of any disagreement with the Company over its operations, policies or practices.
- Ryan J. Smith transitioned from Chief Operating Officer to Delivery Project Executive on November 9, 2026.
- The transition is part of an internal restructuring of Azure Energy.
- Smith is no longer an executive officer or officer of the Company.
- The Company does not intend to appoint a successor Chief Operating Officer at this time.
executive changerestructuring
Items reported
- Item 5.02: Departure of Directors or Certain Officers; Election of Directors; Appointment of Certain Officers: Compensatory Arrangements of Certain Officers
A director or a named officer (such as the CEO or CFO) left or was appointed, or certain executive compensation arrangements were adopted or changed.
Documents
| Type | Description | Document |
|---|---|---|
| 8-K | 8-K | form8-k.htm |
The summary above was generated by AI from the filing text and checked automatically against it. Read the original documents on SEC EDGAR. How to read an 8-K.